• Home
  • About Caledonian
  • Products IEC 60092 Offshore Cables | BS 6883 Offshore Cables | JIS shipboard cables | NEK606 Offshore Cables | Water Blocked NEK606 offshore cables
  • Applications Reference List | Industry
  • Technical Information Material Properties | Standards | Fire Testing | Customized Products | Product Certificates | Cable Glossary | FAQ
  • Download
  • Link Testing Authorities | Testing Equipment Manufacturers | Magazines | Articles | Exhibition News | Organizations | Caledonian Corporater Website
  • Exhibition News
  • Sitemap
  • Contacts
  • Chinese

Offshore & Marine Cables

 

shipboard

 
IEC60092 Offshore & Marine Cables
BS 6883&BS7917 Offshore & Marine Cables
NEK 606 Offshore & Marine Cables
Water Blocked NEK 606 Offshore & Marine Cables
JIS Shipboard cables

 

shipboard

Fire Testing

Reduced Fire Propagation in accordance with IEC 60332-3


This test is the most common one to verify the behaviour of a cables for the fire propagation. The cables are installed on a bunch of vertical ladder inside a metal cabinet and undergo the action of a ribbon flame at 750°C.The standard is subdivided in several parts that differ one from the other for the quantity of cable to be installed, the installation mode and the flame application time. EN 60332-3-10:2009 / BS EN 60332-3-10:2009 / IEC 60332-3-10 ed1.1 / DIN EN 60332-3-10:2009 / VDE 0482-332-3-10:2010-08 – Common test methods for cables under fire conditions. Tests on electric and optical fiber cables under fire conditions - Part 3-10: Test for vertical flame spread of vertically mounted bunched wires or cables.
EN 60332-3-21:2009 / BS EN 60332-3-21:2009 / IEC 60332-3-21 ed1.1 / DIN EN 60332-3-21 / VDE
0482-332-3-21:2010-08 / CEI EN 60332-3-21:2009 (CEI 20-22/3-1)– Procedures. Tests on electric
and optical fiber cables under fire conditions - Part 3-21: Test for vertical flame spread of verticallymounted bunched wires or cables - Category A . F/R -Installation In one layer (front).
-Installation In two layers (front and rear) -The quantity of the Installed cable is equal to 7 litres/m of combustible materials for cables -The time of application of the flame is 40 minutes EN 60332-3-22:2009 / BS EN 60332-3-22:2009 / IEC 60332-3-22 ed1.1 / DIN EN 60332-3-22:2009 /VDE 0482-332-3-22:2010-08 / CEI EN 60332-3-22:2009 (CEI 20-22/3-2)– Procedures. Tests on electric and optical fiber cables under fire conditions - Part 3-22: Test for vertical flame spread of vertically-mounted bunched wires or cable - Category A -Installation In one layer (front).
-The quantity of the installed cable is equal to 7 litres/m of combustible materials for cables
-The time of application of the flame is 40 minutes EN 60332-3-23:2009 / BS EN 60332-3-23:2009 / IEC 60332-3-23 ed1.1 / DIN EN 60332-3-23:2009 / VDE 0482-332-3-23:2010-08 / CEI EN 60332-3-23:2009 (CEI 20-22/3-3)– Procedures. Tests on electric and optical fiber cables under fire conditions - Part 3-23: Test for vertical flame spread of vertically-mounted bunched wires or cables - Category B
-Installation In one layer (front).

-The quantity of the installed cable is equal to 3.5 litres/m of combustible
materials for cables
-The time of application of the flame is 40 minutes EN 60332-3-24:2009 / BS EN 60332-3-24:2009 / IEC 60332-3-24 ed1.1 / DIN EN 60332-3-24:2009 / VDE 0482-332-3-24:2010-08 / CEI EN 60332-3-24:2009 (CEI 20-22/3-4) – Procedures. Tests on electric and optical fiber cables under fire conditions - Part 3-24: Test for vertical flame spread of vertically-mounted bunched wires or cables - Category C
-Installation In one layer (front).
-The quantity of the installed cable is equal to 1.5 litres/m of combustible
materials for cables
-The time of application of the flame is 20 minutes
EN 60332-3-25:2009 / BS EN 60332-3-25:2009 / IEC 60332-3-25 ed1.1 / DIN EN 60332-3-25: 2009 / VDE 0482-332-3-25:2010-08 / CEI EN 60332-3-25:2009 (CEI 20-22/3-5)– Procedures. Tests on electric and optical fiber cables under fire conditions - Part 3-25: Test for vertical flame spread of vertically-mounted bunched wires or cables - Category D -Installation In one layer (front).
-The quantity of the installed cable is equal to 0.5 litres/m of combustible materials for cables
-The time of application of the flame is 20 minutes.

Iec  60332-3-21 60332-3-22 60332-3-23 60332-3-24 60332-3-25
bs en 50266  50266-2-1 50266-2-2 50266-2-3 50266-2-4 50266-2-5
ceI  20-22/3-1 20-22/3-2 20-22/3-3 20-22/3-4 20-22/3-5
category  AF/R A B C D

conductor

cross-

sections

(mm2)

>35 >35 ≤35 >35 ≤35 >35 ≤35 >35 ≤35

nMV(Iitres

per

metre

of

cable) 

7 7 3.5 1.5 0.5

Minimum length of test

pieces(m) 

3.5 3.5 3.5 3.5 3.5

standard ladder (500mm wide):•

number of

layers• maximum width of

test sampIe 

1front+

1rear 300mm

≥1front 300mm 1front 300mm -- ≥1front 300mm 1front 300mm ≥1front 300mm

1front

300mm

≥1front 300mm

Wide ladder

(800 mmwide):•

number of

layers• maximum width of

test sampIe 

-- -- -- 1front 600mm -- -- --

Positioning

oftest pieces 

Spaced

0.5×

Diameter cable (Max.20mm)

Touching

Spaced

0.5×Diameter

cable

(Max.20mm)

Touching

Spaced

0.5×

Diameter cable (Max.20mm)

Touching

Spaced

0.5×

Diameter cable (Max.20mm)

Touching

number of

burners 

1 1 1 2 1 1 1

ladder

mounting 

Front and rear

Front, Wider ladder

for larger cables

Front Front Front

flame application

time(min) 

40 40 40 40 40 40
Test conditions  Wind speed: <8 m/s; Ternperature: 5°C - +40°C

extent of the charred

portion

≤2.5m above the bottom edge of the burner, neither at the front nor at the rear of the ladder.

 